Rouleau 30 m x Largeur : 6 /7,5 / 15 cm
La pièce
Inside: Airtight bonding of vapour check and airtightness membrane as well as airtight wood-based panels.
Outside: Airtight bonding of roof-mounted vapour check and refurbishment vapour check and airtightness membrane. Windproofing of sarking membrane, roof lining membrane and wall lining membrane (e.g. pro clima SOLITEX). Wind-proof bonding of wood-based panels used as sarking boards.
All bonding, indoor and outdoor, can be between the same material as well as with adjacent structural components with a smooth, non-mineral surface (e.g. pipe penetrations, roof windows).
Material | |
Backing | special PP fleece |
Adhesive | waterproof SOLID adhesive |
Release film | siliconized paper |
Attribute | Norm | Value |
Colour | dark blue | |
Exposure time | 6 months | |
Application temperature | above -10 °C / 14 °F | |
Temperature resistance | permanent -40 °C/-40 °F to +90 °C/194 °F | |
Storage | cool and dry |
Before sticking, subsurfaces should be brushed off, wiped clean with a cloth or cleaned using compressed air.
Adhesion to frozen surfaces is not possible. There must be no water-repellent substances (e.g. grease or silicone) on materials to be bonded. Subsurfaces must be sufficiently dry and have sufficient load-bearing capacity.
Permanent adhesion is achieved on all pro clima interior and exterior membranes, other vapour retarder and airtight membranes (e.g. those made of PE, PA, PP and aluminium) as well as other underlay/sarking and wall lining membranes (e.g. those made of PP and PET).
Adhesion and joints can be carried out on planed and painted wood, hard plastics and metal (e.g. pipes, windows etc.), hard wood-based panels (chipboard, OSB and plywood panels, MDF board and softwood fibre sub-roof panels).
Wood fibre sub-roof panels and smooth mineral subsurfaces require pre-treatment with TESCON PRIMER RP before bonding. Concrete or plaster subsurfaces must not be sandy or crumbling.
The best results in terms of structural stability are achieved on high-quality subsurfaces.
It is your responsibility to check the suitability of the subsurface; adhesion tests are recommended in certain cases.
Pretreatment with TESCON PRIMER RP is recommended in the case of subsurfaces with insufficient load-bearing capacity.
The bonds should not be subjected to tensile strain.
After sealing the vapour retarding membranes, the weight of the insulating material must be borne by lathing. Adhesion should be supported by battens if necessary.
Press firmly to secure the adhesive tape. Ensure there is sufficient back-pressure. Windproof, airtight or rainproof seals can only be achieved on vapour retarding membranes, roof lining membranes or façade membranes that have been laid without folds or creases. Ve
ntilate regularly to prevent build-up of excessive humidity and use a dryer if necessary.